Damien Drake - Project
Superintendent, Jim Greany, William Johnson and Troy French,
did a terrific job with the new antenna installation project at the
Embassy in Bangkok, Thailand. Although this was the third installation of
its kind, this particular installation required the new antenna system to
be mounted on a large structural steel platform; which was a first for
these installations. Although the platform presented some unique
challenges the crew completed the assembly and follow on construction work
ahead of schedule.
Jim, One senior engineer stated this is the best construction team he has ever seen at an embassy. As the Government PM, I would welcome this greenway team on any of the ESS installations in the future. The DPI and AT&T team arrived on site
several days after my arrival and immediately began work. Ivan (from
DPI) was particularly impressive considering he arrived a day late due to
circumstances beyond his control. Upon his arrival he showed up to
work with less than 4 hours sleep. The entire installation team hit
the ground running and began preparation work for the dish construction.
They required very little assistance from post personnel and were very
self sufficient. This trait is extremely welcome by post personnel
who are often burdened by visitors who require constant attention.
All three team members from AT&T and DPI are valuable assets to the
ESS program and I look forward to their continued involvement with this
effort. Thank you for a job well done.
|